![]() Press ReleasesMedia Contacts: TELLURIDE SKI RESORT INSTALLS EPIC STAIRWAY ON GOLD HILL
“This addition is a continuation of our efforts to provide ski experience which is ‘Unmatched in North America,’” said Dave Riley, CEO of the resort. “This project was extremely technical, and our in house staff has done a phenomenal job in both planning and execution. The Telluride Ski Resort is thrilled to once again expand easy access into epic inbounds terrain.” The stairs and bridge were designed and fabricated by 12 year veteran and Lift Master Mechanic, Mark Bosse. With the company since 1997, Boss custom created, constructed and brought the project to fruition over the several months. The two sets of stairs measure 48 and 54 feet, and weigh 3304 and 3324 pounds, respectively. The bridge measures 24 feet in length and weighs 2750 pounds. All three components measure 30 inches wide, feature hand railings on both sides and serrated grated steel walking surface. Together, the stairway and bridge combine make up 126 linear feet ascending Gold Hill. While the new addition will be under construction to solidify access for a couple of days, the new stairs and bridge will be available for use by Saturday, Feb. 27, 2010, weather permitting. For more information on the Telluride Ski Resort, please go to www.tellurideskiresort.com, or call 1-800-778-8581 to book your reservation today! |